Facilities
Marine Infrastructure
- Maintained channel depth of 11 feet from the Intracoastal Canal to the port
- Maintained channel width of 80 feet from the Intracoastal Canal to the port
- Marine loading dock able to accommodate shallow-water barges of most lengths and widths
Surface Transportation Infrastructure
- 80,000-pound load-limit road
- Hard-surface roadway
- Main entry / exit from Johnny Breaux Road
- Current improvement plans call for the extension of Johnny Breaux Road north one mile to Highway 108 near Exit 8 of I-10. Construction is scheduled to being by late 2015.
Utilities
- Phase 2 electrical system provided by Entergy