Facilities

Marine Infrastructure

  • Maintained channel depth of 11 feet from the Intracoastal Canal to the port
  • Maintained channel width of 80 feet from the Intracoastal Canal to the port
  • Marine loading dock able to accommodate shallow-water barges of most lengths and widths

Surface Transportation Infrastructure

  • 80,000-pound load-limit road
  • Hard-surface roadway
  • Main entry / Exit 8 of I-10 via Johnny Breaux Road

Utilities

  • Phase 2 electrical system provided by Entergy
  • Water & sewage available
Scroll to Top